Mitsubishi Power · Steam turbine generator sets
Two used Mitsubishi TC2F-23 condensing steam turbine power blocks, each about 130 MW at 50 Hz (260 MW total), manufactured in 1995 and commissioned in 1997. One unit is in commercial operation and the other is in preserved standby, with 192,500 EOH and 188,900 EOH recorded. The scope is a complete power block including boilers, generators, transformers and auxiliaries.
This listing is for two Mitsubishi TC2F-23 condensing steam turbine power blocks, each rated at about 130 MW at 50 Hz (turbine 128.6 MW; Alstom generator 130.2 MW / 162.7 MVA), or 260 MW in total. They were manufactured in 1995 and commissioned in 1997, and are offered used. One unit is installed and in commercial operation; the other is installed in preserved standby and is not producing, with its electrical systems kept energised or in cold standby. Two units are available.
Each machine is a tandem-compound, single-reheat, double-flow LP steam turbine with 23-inch last-stage blades, running at 3,000 rpm. Main steam conditions are 156 bar(a) / 538 °C, with hot reheat at 538 °C and six stages of feedwater heating. The recorded equivalent operating hours are 192,500 EOH and 188,900 EOH, with 84 and 83 starts. Turbine valve and thermal shield modifications were carried out in 2010 and 2011. Unit A had a major overhaul in 2017, including a full generator opening, with stator, rotor and electrical tests reported as satisfactory. Unit B had a turbine major overhaul in 2011 and a generator major overhaul in 2014; a full inspection and overhaul is expected before it is recommissioned.
The scope is a complete power block for both units: the steam turbines and Alstom T 240-370 generators, the pulverised-coal utility boilers (with fuel-oil start-up and support firing), condensers and feedwater plant, the installed GSU and auxiliary transformers plus one spare GSU transformer (2012, never connected), switchgear and controls, once-through seawater cooling, water treatment, coal and ash handling, warehouse spares and full technical documentation. Two further 125 MW units, out of service since 2019, are excluded from the sale. The technical information pack and photos are attached.
| Parameter | Details |
|---|---|
| Manufacturer / Model | Mitsubishi TC2F-23 (generators: Alstom T 240-370) |
| Type | Tandem-compound, single-reheat, double-flow LP condensing steam turbine power block |
| Rated Output | About 130 MW per unit (turbine 128.6 MW; generator 130.2 MW / 162.7 MVA); 260 MW total |
| Frequency | 50 Hz |
| Configuration | Single-shaft, 3,000 rpm, clockwise |
| Main Steam / Reheat | 156 bar(a) / 538 °C; hot reheat 538 °C |
| Steam Path | HP (Curtis + impulse), IP (impulse), LP (reaction), 23-inch last-stage blades; 6 extraction stages |
| Year of Manufacture | 1995 (commissioned 1997) |
| Operating Hours | 192,500 EOH and 188,900 EOH |
| Starts | 84 and 83 |
| Generator | Alstom T 240-370, 162.7 MVA / 130.2 MW, 50 Hz, 8,170 A, about 12.3 kV, synchronous with exciter |
| Boilers | Pulverised-coal utility boilers, drum type, with fuel-oil start-up and support firing |
| Cooling | Once-through seawater condenser with circulating water pumps |
| Transformers | Installed GSU 150 MVA, 245 / 12.3 kV, YNd11; auxiliary transformer 25 MVA + 8.35 MVA tertiary, 22.6 / 6.35 kV, OLTC; spare GSU 130/162 MVA ONAN/ONAF, 245 / 11.5-12.3 kV, OLTC (2012, never connected) |
| Upgrades / Overhauls | Turbine valve and thermal shield modifications 2010 / 2011; Unit A major overhaul 2017; Unit B turbine major overhaul 2011 and generator major overhaul 2014 |
| Condition | Used; Unit A in commercial operation; Unit B installed, not producing, preserved standby |
| Availability | 2 units available (1 operating + 1 preserved standby) |
| Location / Terms | Europe |
| System | Equipment |
|---|---|
| Steam Turbines | 2 × Mitsubishi TC2F-23 steam turbines with valves, lube and control oil systems |
| Generators | 2 × Alstom T 240-370 generators with exciters |
| Steam Generators | 2 × utility boilers with burners, fans, sootblowers and fuel-oil system |
| Condensate & Feedwater | Condensers, condensate pumps, feedwater heaters, drain systems and the feedwater system |
| Transformers | Installed GSU and auxiliary transformers, plus 1 × spare 162 MVA GSU transformer (2012) |
| Electrical & Controls | MV/LV switchgear and MCCs; DCS / control room equipment |
| Cooling & Water Treatment | Once-through seawater cooling with circulating water pumps; desalination / water treatment units |
| Fuel & Ash Handling | Coal mills and coal conveyor system; dry ash handling system |
| Spares & Documentation | Warehouse spare parts (strategic spares) and full technical documentation, OEM manuals and drawings |
| Excluded from Sale | Two further 125 MW units, out of service since 2019 |
If you require any further information on this listing please contact info@reflowx.com