Description
This listing covers two multi-shaft combined cycle packages, each made up of two GE MS9001E gas turbines (about 102 MW each) and one Toshiba tandem-compound steam turbine (about 109 MW), roughly 310 MW per package at 50 Hz. The equipment was built in 1990-1991 and runs on dual fuel. It is retired and decommissioned and used, maintained equipment is available as the full set of 4 gas turbines and 2 steam turbines.
The gas turbines have between about 121,500 and 132,100 operating hours and the steam turbine about 147,931 hours. Final gas turbine major overhauls were completed in 2012-2013, including generator re-insulation. Each package covers a gas turbine island with GE 9H2 hydrogen-cooled generator and a steam turbine island with Toshiba generator, condenser, feed water system and DCS. The technical information pack and photos are attached.
Specifications
| Parameter | Details |
|---|---|
| Configuration | 2 packages, each 2 gas turbines + 1 steam turbine (4 GT + 2 ST in total) |
| Gas Turbines | GE MS9001E (PG9161E, upgraded to PG9171E), about 102 MW each |
| Steam Turbine | Toshiba tandem compound TCDF-23", about 109 MW each |
| Package Output | Approx. 310 MW per package |
| Frequency | 50 Hz |
| Fuel | Dual fuel |
| Year of Manufacture | 1990-1991 (commissioned 1990-1992) |
| Operating Hours | GT approx. 121,500-132,100 h; ST approx. 147,931 h |
| Starts | GT approx. 333-1,020 |
| Generators | GE 9H2 hydrogen-cooled, 128.6 MVA; Toshiba TAKL, 145 MVA |
| Condition / Availability | Used, maintained; retired / decommissioned |
Scope of Supply
| System | Equipment |
|---|---|
| Gas Turbine Island (per package) | GE MS9001E gas turbine cores with GE 9H2 generators, air inlet filter house, compressor wash skid, fuel gas scrubber, dual-fuel forwarding and water injection skids |
| GT Auxiliaries & Controls | Fin-fan cooling module, CO2 fire protection, GE Speedtronic Mark VI control system and EX2100 static exciter |
| Electrical | Main and auxiliary transformers, auxiliary breakers and isolated phase bus ducts |
| Steam Turbine Island (per package) | Toshiba TCDF-23" steam turbine core with TAKL generator, main steam control valves, surface condenser and vacuum unit |
| Water & Oil Systems | Boiler feed water pumps, closed cooling water pumps, deaerator tank, lube oil / hydraulic tanks with jacking oil system and purifier |
| Plant Controls | Distributed Control System (DCS), EX2100 exciter and station battery systems |
If you require any further information on this listing please contact info@reflowx.com
Technical Details
| Year of Manufacturing | 1990-1991 |
|---|---|
| Model Number | MS9001E / TCDF-23" |
| Fuel type | Dual Fuel |
| Usage Hours | 121,500-132,100 hrs (GT) |
| Manufacturer Name | General Electric / Toshiba |
| Voltage | GE 9H2 (128.6 MVA, 11.5 kV) & Toshiba TAKL (145 MVA, 13.8 kV) |
| Temperature Range | 11,317 kJ/kWh (LHV) |
| Ready for Inspection | Yes |
| Owner type | Direct Owner |
| Availability Status | Available |
| Frequency | 50 Hz |
| Output Power | 310 MW per package |
| Turbine Cycle | Combined Cycle |
Supporting Documents
General Terms
- ReflowX and the seller retain the right to evaluate and approve offers.
- Buyers should verify quantities and conditions upon delivery.
- After successful engagement, both buyer and seller manage communication for payment terms and delivery schedule.
- All parties agree to adhere to ReflowX Terms and Conditions in transactions.
- Buyers can request value-added services such as pre-purchase inspections, Expediting & Delivery Services through ReflowX. Contact us!