Occupied
Product image 1
Product image 2
Product image 3
Product image 4
Product image 5
Product image 6
Product image 7
Product image 8
Product image 9
Product image 10
Thumbnail 1
Thumbnail 2
Thumbnail 3
Thumbnail 4
Thumbnail 5
Thumbnail 6
Thumbnail 7
Thumbnail 8
Thumbnail 9
Thumbnail 10

Description

GE LM2500+G4 — 33 MW Natural-Gas Turbine Generator Package (NEW 2025)

Summary

Brand-new, zero-hour GE LM2500+G4 gas-turbine generator set available for sale. The package is fully factory-assembled and includes turbine, generator, auxiliaries, acoustic enclosure, digital control system, and emissions-controlled DLE combustion. 

 

Key Specifications

ItemValue
ISO Power Output32-33 MW Nanjing Generator for L…
Generator Voltage / Frequency10.5 kV, 50 Hz Nanjing Generator for L…
Power Factor0.8 (lag) Nanjing Generator for L…
Speed3 000 rpm Nanjing Generator for L…
FuelDry-Low-Emission Natural Gas (NOₓ ≤ 50 mg/Nm³ without water/steam) z ge LM2500+G4 scope
Ambient Range-25 °C … +55 °C, altitude ≤ 1 000 m Nanjing Generator for L…
Insulation ClassF / B Nanjing Generator for L…
Warranty12 months

 

Package Inclusions

LM2500+G4 twin-shaft gas turbine with variable-geometry compressor and six-stage power turbine.

10.5 kV, three-phase brushless-excited generator, ready for outdoor installation.

Weather-proof acoustic enclosure – 85 dB(A) at 1 m during full-load operation z ge LM2500+G4 scope.

Modular static air-inlet filtration (pre-filter & final filter) with divided flow for combustion and enclosure ventilation z ge LM2500+G4 scope.

Integrated auxiliaries: dual lube-oil systems (synthetic & mineral), electro-hydraulic start skid, on-line/off-line water-wash skid, side-exhaust arrangement for flexible plant layout.

Control & protection: Woodward Micronet+ fuel controller, GE Rx3i sequencer, HMI, generator protective relay, dual 24 V DC battery/charger set z ge LM2500+G4 scope.

Factory CO₂ fire-protection system with optical flame, hydrocarbon and thermal detectors; alarms annunciated on the turbine control panel z ge LM2500+G4 scope.

 

Condition & Availability

Year of manufacture: 2025 (unused, zero operating hours)

Location: Shanghai, China (EXW)

Lead time: Ready to ship within 7 months of purchase order.

Comprehensive documentation, QA records and test certificates supplied.

Optional installation & commissioning advisory services available on request.

 

Pricing

$30,000,000 EXW China

 

Contact

Message via ReflowX for further information rfq@reflowx.com +971 50 384 6311

Technical Details

Model NumberLM2500+G4
Year of Manufacturing2025
Manufacturer NameGE
Fuel typeNatural Gas
Output Power33MW

General Terms

  • ReflowX and the seller retain the right to evaluate and approve offers.
  • Buyers should verify quantities and conditions upon delivery.
  • After successful engagement, both buyer and seller manage communication for payment terms and delivery schedule.
  • All parties agree to adhere to ReflowX Terms and Conditions in transactions.
  • Buyers can request value-added services such as pre-purchase inspections, Expediting & Delivery Services through ReflowX. Contact us!

Similar Products in

Reflowx icon

ReflowX - A Trusted Marketplace for Surplus Energy Sector Equipment

Shape a sustainable and circular future while reducing costs and carbon emissions with us.

  • Free Listings, No Hidden Fees
  • Low-Cost Procurement
  • Cost Recovery Solutions
  • Tailored Sales Support
App StoreGoogle Play
Mobile App
GE LM2500+G4 — 33 MW Natural-Gas Turbine Generator Package (NEW 2025)