Siemens SGT-400 DLE — 14.4 MW Twin-Shaft Gas-Turbine Package (2019 • 242 h)

Siemens SGT-400 DLE — 14.4 MW Twin-Shaft Gas-Turbine Package (2019 • 242 h)

ReflowX SKU: REF-7573

Product Details

  • Quantity
    1
  • Availability (Lead Time)
    0-2 Weeks
  • Product Location
    China
  • Condition
    New
  • OEM
    Siemens Germany
  • Equipment code
    CFIHOS-30000685
  • Total Price
  • Per Unit Price
    $ 10,800,000.00
Whatsapp

Short Description

Low-hour (≈242 h / 26 starts) 2019-manufactured Siemens Energy SGT-400 DLE gas-turbine set, suitable for mechanical-drive OR power-generation duties. Package is complete, factory-tested and stored indoors; ready for dispatch from Shanghai, China (FOB).

Description

Siemens SGT-400 DLE — 14.4 MW Twin-Shaft Gas-Turbine Package (2019 • 242 h)

 

Quick Overview

Low-hour (≈242 h / 26 starts) 2019-manufactured Siemens Energy SGT-400 DLE gas-turbine set, suitable for mechanical-drive OR power-generation duties. Package is complete, factory-tested and stored indoors; ready for dispatch from Shanghai, China (FOB).

 

Key Technical Data

ItemValue 
Nominal ISO output14.3 – 14.9 MW (simple-cycle, 15 MW variant) 
Voltage / frequency11 kV, 50 / 60 Hz 
ConfigurationTwin-shaft, Dry-Low-Emissions (DLE) 
Gross simple-cycle efficiency≈ 35.6 % 
NOₓ emissions (gas-fuel)≤ 15 ppm @ 15 % O₂ 
Package weight~40 t (power-gen skid) 
FuelNatural gas 

 

Scope of Supply

SGT-400 twin-shaft gas turbine core with can-annular DLE combustor.

AC generator (11 kV class) or gear-coupling for mechanical-drive service – supplied to buyer’s final spec.

Modular skid packages: lube-oil, gas fuel, starter, ventilation & silencers.

Inlet filtration & exhaust stack with diverter damper.

Siemens PCS 7 / S7-400 control system with HMI and remote-monitoring capability.

Fire & gas detection and CO₂ suppression installed in acoustic enclosure (85 dB(A) @ 1 m).

Complete technical library: P&IDs, wiring, QA records, factory test certificates.

 

Condition & Availability

Service history: Factory acceptance only (242 operating hours, 26 starts).

Year built: 2019 | Warranty: negotiable Siemens LTSA transfer possible.

Location: Shanghai free-zone warehouse — can be inspected virtually or in person.

Delivery term: FOB Shanghai Port – ready to ship in ≤ 4 weeks after receipt of L/C.

 

Pricing

$10,800,000 EXW China

 

Contact

Message via ReflowX for further information rfq@reflowx.com +971 50 384 6311

Technical Details

Model Number
SGT-400 DLE
Year of Manufacturing
2019
Manufacturer Name
Siemens
Usage Hours
242
Fuel type
Natural gas

General Terms

  • ReflowX and the seller retain the right to evaluate and approve offers.
  • Buyers should verify quantities and conditions upon delivery.
  • After successful engagement, both buyer and seller manage communication for payment terms and delivery schedule.
  • All parties agree to adhere to ReflowX Terms and Conditions in transactions.
  • Buyers can request value-added services such as pre-purchase inspections, Expediting & Delivery Services through ReflowX. Contact us!

Similar Products in Turbine


What Our Customers Say

Reflowx icon

ReflowX - A Trusted Marketplace for Surplus Energy Sector Equipment

Shape a sustainable and circular future while reducing costs and carbon emissions with us.

  • ✅ Free Listings, No Hidden Fees
  • ✅ Low-Cost Procurement
  • ✅ Cost Recovery Solutions
  • ✅ Tailored Sales Support
Mobile App

Tell Us Your Requirement Surplus Equipment | New Equipment | Sustainable Procurement

All Categories×
Power Generation
Power Generation
Power Generation ×
All Categories ×
Power Generation
Power Generation
Pipe ×
×
Add New Address