Siemens SGT5-2000E (V94.2) Combined-Cycle Blocks — 3 × 223 MW (NEW / 2012)

Siemens SGT5-2000E (V94.2) Combined-Cycle Blocks — 3 × 223 MW (NEW / 2012)

ReflowX SKU: REF-8507

Product Details

  • Quantity
    3
  • Availability (Lead Time)
    0-2 Weeks
  • Product Location
    China
  • Condition
    New
  • OEM
    Siemens
  • Equipment code
    CFIHOS-30000685
Get Quotation Whatsapp

Short Description

Three zero-hour Siemens SGT5-2000E gas-turbine generator (GTG) packages, each paired with a matching steam-turbine generator (STG) and HRSG to form a 223 MW natural-gas-fired combined-cycle power island.

Description

 

Siemens SGT5-2000E (V94.2) Combined-Cycle Blocks — 3 × 223 MW (NEW / 2012)

 

Three zero-hour Siemens SGT5-2000E gas-turbine generator (GTG) packages, each paired with a matching steam-turbine generator (STG) and HRSG to form a 223 MW natural-gas-fired combined-cycle power island. All equipment remains in OEM export crates and is offered FOB Tianjin Port, China for rapid shipment.

 

Key Technical Data (per block)

ItemValue 
Gas-turbine modelSiemens SGT5-2000E (V94.2) 
GT ISO output166 MW @ 50 Hz, 10.5 kV 
Steam-turbine output≈ 57.3 MW (user-supplied) 
Block net output≈ 223 MW simple combined cycle 
FuelNatural gas, dry-low-NOₓ combustor 
Year of manufacture2012 
Operating hours0 h / never installed 
Quantity available3 identical blocks 
Generator voltage / freq.10.5 kV, 50 Hz, PF 0.85 

 

Scope of Supply (per block)

Gas turbine package: SGT5-2000E engine, brushless generator, base skid, acoustically-lined enclosure and inlet / exhaust stacks.

Steam turbine & generator (57 MW class) with surface condenser and gland-steam system.

Triple-pressure HRSG with bypass stack and diverter dampers.

Balance-of-Plant modules: lube-oil skids, closed-loop coolers, fuel-gas conditioning, demin-water make-up, condensate polishing, and CO₂ fire-protection.

Electro-control: SPPA-T3000 DCS, GT/ ST excitation, GT SFC starter, high-voltage (10.5 kV) GIS, LV & MCC line-ups, protection relays and UPS/battery sets.

Ancillaries: stack & HRSG chimney, piping spools, HVAC, maintenance tools, QA dossiers and drawings.

 

 

Condition & Logistics

Factory-crated; one package opened only for visual inspection — no commissioning performed.

FOB Tianjin Port, China; dispatch within 30 working days after contract and initial payment.

 

Pricing

Please Inquire 

 

Contact

Message via ReflowX for further information rfq@reflowx.com +971 50 384 6311

 

Technical Details

Model Number
SGT5-2000E
Year of Manufacturing
2012
Manufacturer Name
Siemens

General Terms

  • ReflowX and the seller retain the right to evaluate and approve offers.
  • Buyers should verify quantities and conditions upon delivery.
  • After successful engagement, both buyer and seller manage communication for payment terms and delivery schedule.
  • All parties agree to adhere to ReflowX Terms and Conditions in transactions.
  • Buyers can request value-added services such as pre-purchase inspections, Expediting & Delivery Services through ReflowX. Contact us!

Similar Products in Turbine


What Our Customers Say

Reflowx icon

ReflowX - A Trusted Marketplace for Surplus Energy Sector Equipment

Shape a sustainable and circular future while reducing costs and carbon emissions with us.

  • ✅ Free Listings, No Hidden Fees
  • ✅ Low-Cost Procurement
  • ✅ Cost Recovery Solutions
  • ✅ Tailored Sales Support
Mobile App

Tell Us Your Requirement Surplus Equipment | New Equipment | Sustainable Procurement

All Categories×
Power Generation
Power Generation
Power Generation ×
All Categories ×
Power Generation
Power Generation
Pipe ×
×
Add New Address