-
Buy Now
Availability (Lead Time) : 4-6 Weeks
-
Buy Now
Availability (Lead Time) : 0-2 Weeks
-
Buy Now
Manual-valve
High Performance Ductile Iron Double Offset Butterfly Valve – Handa
Item Available: 100
China
Availability (Lead Time) : 4-6 Weeks
-
Buy Now
Valves
BZSV HTKH-B 1"–12" Quick Switching Device – Class 150~600, High-Temperature
Item Available: 500
China
Availability (Lead Time) : 4-6 Weeks
-
Buy Now
Availability (Lead Time) : 0-2 Weeks
-
Buy Now
Availability (Lead Time) : 0-2 Weeks
-
Buy Now
Cabinet
Polyethylene Corrosive Safety Cabinet – ACP80001, 4 Gal Capacity, Manual Door
Item Available: 1
China
Availability (Lead Time) : 0-2 Weeks
-
Buy Now
Power Generation
Cummins C1160N5C Natural Gas Engine – 1160 kW, 10.5 kV, 50 Hz | Low Hours (2018)
Item Available: 1
China
Availability (Lead Time) : 0-2 Weeks
-
Buy Now
Cabinet
Undercounter Flammable Cabinet: WA0810190
Item Available: 1
China
Availability (Lead Time) : 0-2 Weeks
-
Buy Now
Manual-valve
Cryogenic Globe Valve (TEJI) – Precision Machined, Extended Bonnet, PTFE/Elgiloy Lip-Seal
Item Available: 100
China
Availability (Lead Time) : 4-6 Weeks
-
Buy Now
Manual-valve
TEJI 8" Cryogenic Ball Valve – Class 2500, Long Neck, Floating Ball Design, -196°C Rated
Item Available: 100
China
Availability (Lead Time) : 4-6 Weeks
-
Buy Now
Availability (Lead Time) : 0-2 Weeks
-
Buy Now
Availability (Lead Time) : 4-6 Weeks
-
Buy Now
Availability (Lead Time) : 0-2 Weeks
-
Buy Now
Line Pipe
Handa Galvanized Steel Seamless Pipe – Hot Dip & Cold-Plated Options
Item Available: 103
China
Availability (Lead Time) : 4-6 Weeks
-
Buy Now
Availability (Lead Time) : 4-6 Weeks
-
Buy Now
Valves
NSW C95800 Bronze Ball Valve – Full Port, Class 150/300, BSP/NPT Threaded & Flanged Ends
Item Available: 500
China
Availability (Lead Time) : 4-6 Weeks
-
Buy Now
Valves
JH 2"–24" Double Block and Bleed Plug Valve – Class 150–1500, Low Torque
Item Available: 500
China
Availability (Lead Time) : 4-6 Weeks
-
Buy Now
Turbine
Siemens SGT-400 DLE — 14.4 MW Twin-Shaft Gas-Turbine Package (2019 • 186 h)
Item Available: 1
China
Availability (Lead Time) : 0-2 Weeks
-
Buy Now
Turbine
Siemens SGT5-2000E (V94.2) Combined-Cycle Blocks — 3 × 223 MW (NEW / 2012)
Item Available: 3
China
Availability (Lead Time) : 0-2 Weeks